Home/Our Trades/Plumbing Estimating Takeoff Services
Sample Report
Plumbing Estimating Takeoff Services
Estimating Canada — Sample Takeoff Report
| Description | Unit | Qty |
|---|---|---|
| Fixture Counts | CY | 120 |
| Domestic Water Piping | SF | 340 |
| Drain, Waste & Vent | LF | 560 |
| Gas Piping | EA | 48 |
| Equipment & Water Heaters | hrs | 210 |
| Labour Hours | LS | 1 |
Illustrative figures only. The real sample PDF will appear here soon.
Fixtures, Piping & Drainage
Plumbing takeoffs require careful tracing of pipe runs, fixtures, and risers. We quantify domestic water, sanitary, storm, and gas systems from plumbing drawings and riser diagrams for residential and commercial work.
Toilets, sinks, showers, drains, and specialty fixtures from schedules.
Hot, cold, and recirculation piping by size and material.
Sanitary and storm lines with fittings, cleanouts, and hangers.
Natural gas and propane lines, regulators, and appliance connections.
Boilers, water heaters, pumps, and backflow devices.
Rough-in and finish labour by fixture and pipe size.

Why Choose Estimating Canada
Plumbing estimates are won or lost on pipe length, fixture count and the fittings nobody remembers to count. A fixture that appears on the plan but not on the schedule, or a riser that changes size between floors, can turn a good bid into a loss.
We prepare plumbing takeoffs and estimates for contractors across Canada, covering water, drainage, venting, gas and equipment hookups.
Pipe lengths are given in feet (or metres on request) by size and material. Fittings are counted from the drawings, and where the drawings do not show them we add an allowance on its own line so you can adjust it.
The material mix depends on the job: copper and PEX for water, and cast iron, ABS or PVC for drainage. Waste is shown as its own line, usually in the 5 to 10% range for materials that are cut and trimmed, and none for items that are counted by piece.
Who pipes the condensate? Who supplies the water heater disconnect? We list those items and the assumed owner, so they do not fall between subcontractors.
Related pages
We use the plans and the schedule together because they do not always match, and then flag the differences.
Fittings are counted where the drawings show them. An allowance for the rest is added on its own line.
Yes, to the plans and the gas code. A licensed gas fitter must still do the work.
Yes. New homes, renovations and multi-unit buildings.
Get a Quote
Tell us what you need and we’ll get back to you within minutes.
We Cover