Home/Our Trades/Electrical Work Estimating
Sample Report
Electrical Work Estimating
Estimating Canada — Sample Takeoff Report
| Description | Unit | Qty |
|---|---|---|
| Conduit & Wire Takeoffs | CY | 120 |
| Panels & Distribution | SF | 340 |
| Lighting Fixtures & Controls | LF | 560 |
| Devices & Receptacles | EA | 48 |
| Low-Voltage & Fire Alarm | hrs | 210 |
| Labour Unit Rates | LS | 1 |
Illustrative figures only. The real sample PDF will appear here soon.
Power, Lighting & Low Voltage
Electrical bids involve thousands of small items that add up quickly. We count and measure conduit, cable, panels, devices, and lighting fixtures from electrical plans for residential, commercial, and industrial projects.
Conduit runs, wire and cable by size, with fittings and supports.
Switchgear, panelboards, transformers, and disconnects from single-line diagrams.
Fixture counts by type with dimming and occupancy controls.
Switches, outlets, data, and specialty devices counted by room.
Data, security, communications, and fire alarm devices and cabling.
Installation hours per device and per foot of raceway.

Why Choose Estimating Canada
Two electrical contractors can price the same drawings and land far apart. The gap is usually labour. How long it takes to pull feeder cable, set a switchboard or trim out a lighting package decides who wins the job and who loses money on it.
We prepare electrical takeoffs and estimates for contractors across Canada, with device counts, cable and conduit runs, equipment and labour hours shown line by line.
Every counted item carries a labour-hour figure. We multiply the quantity by the hours per unit and then by the hourly rate, so you can see exactly where the labour number comes from and change any one of the three inputs. Devices, cable runs, panels and fixtures each get their own hours instead of one lump percentage.
Labour is the biggest swing. A bid built on a rough profit margin rather than on counted quantities and current hourly rates will either lose the job or lose money on it. The other common gap is power for equipment shown on the mechanical drawings, such as disconnects and feeders to rooftop units.
Small electrical takeoffs are normally ready in about 4 to 6 hours. Larger projects take 6 to 48 hours depending on size and urgency.
Both. We show quantities, labour hours per unit and your hourly rate, so you can change any of them.
Yes. Data, security, access control, audio-visual and fire alarm can be priced with the power scope or on their own.
We also read the specifications and addenda, because many cost items live there.
Yes, using prevailing wage rates where they apply.
Get a Quote
Tell us what you need and we’ll get back to you within minutes.
We Cover