Home/Our Trades/MEP Estimating Services
Sample Report
MEP Estimating Services
Estimating Canada — Sample Takeoff Report
| Description | Unit | Qty |
|---|---|---|
| Mechanical & HVAC Takeoffs | CY | 120 |
| Electrical Takeoffs | SF | 340 |
| Plumbing & Piping Takeoffs | LF | 560 |
| Labour Hour Estimates | EA | 48 |
| Equipment Schedules | hrs | 210 |
| Cross-Trade Coordination | LS | 1 |
Illustrative figures only. The real sample PDF will appear here soon.
Mechanical, Electrical & Plumbing
Building systems are among the costliest and most error-prone parts of a bid. Our MEP estimators quantify mechanical, electrical, and plumbing scopes from drawings and specifications so every duct, conduit, and pipe run is accounted for.
Ductwork, equipment, diffusers, controls, and insulation measured from drawings.
Conduit, wire, panels, devices, and lighting fixtures counted by type and length.
Fixtures, drain-waste-vent, domestic water, and gas piping with fittings.
Productivity-based labour calculated for each system and trade.
Major equipment pricing pulled into one coordinated schedule.
Overlap and gaps between mechanical, electrical, and plumbing flagged early.

Why Choose Estimating Canada
When mechanical, electrical and plumbing are priced by three different people, the items between the trades are where money disappears. Who powers the rooftop unit? Who connects the condensate drain? Who supplies the disconnect for the water heater? If nobody can answer, the answer is usually the general contractor.
We estimate all three systems so every shared item has a named owner before the bid goes out.
Mechanical, electrical and plumbing are normally carried out by different subcontractors, so we price each trade as its own scope. The shared items are listed on a separate scope split sheet with one assumed owner each, so your sub quotes can be levelled against the same baseline.
Yes. Each trade can be ordered on its own. Looking at all three just helps catch gaps.
Sprinklers and fire pumps can be added on request.
Each shared item is assigned to one trade and listed on the scope split sheet.
Yes. The estimate gives you a baseline to compare sub quotes against.
Get a Quote
Tell us what you need and we’ll get back to you within minutes.
We Cover