Sitework & Earthwork Estimating Services
Estimating Canada — Sample Takeoff Report
| Description | Unit | Qty |
|---|---|---|
| Cut & Fill Volumes | CY | 120 |
| Excavation & Backfill | SF | 340 |
| Underground Utilities | LF | 560 |
| Paving & Curbs | EA | 48 |
| Erosion & Sediment Control | hrs | 210 |
| Landscaping & Site Features | LS | 1 |
Illustrative figures only. The real sample PDF will appear here soon.
Excavation, Grading & Utilities
Sitework is where unforeseen conditions drive cost overruns. We quantify excavation, backfill, grading, utilities, and paving from civil and geotechnical drawings, giving you reliable earthwork volumes and unit costs.
Earthwork volumes calculated from existing and proposed grades.
Trenching, foundations, and structural backfill with compaction.
Storm, sanitary, and water mains with structures and bedding.
Asphalt, concrete paving, curbs, and sidewalks by area and thickness.
Silt fencing, matting, and temporary controls required by permits.
Topsoil, sod, planting, and site furnishings priced by area.

Why Choose Estimating Canada
Sitework is where the project meets the ground, and the ground is rarely what the drawings assume. Topsoil, rock, groundwater, frost and the haul distance all change the number, and earth is measured in volumes that are easy to get wrong.
We prepare excavation, grading and sitework takeoffs with cut and fill in cubic yards, so you can price trucking, equipment and materials.
Volumes are shown as bank and loose where it matters, with haul and disposal on separate lines. Rock and contaminated soil are priced as allowances, and the assumption is written next to them.
Small sitework takeoffs are normally ready in about 4 to 6 hours and larger projects in 6 to 48 hours, depending on size and urgency.
Yes, using the existing and proposed contours to calculate cut and fill.
As allowances with the assumption stated, since the drawings usually cannot show them.
Yes. Asphalt, concrete and base are counted separately.
Yes. Pipe, structures, bedding and backfill are counted by run.