Call Us: +1 (647) 556-5580

Concrete Estimating

Home/Our Trades/Concrete Estimating

Sample Report

See What You’ll Receive

Demo Sample

Concrete Estimating

Estimating Canada — Sample Takeoff Report

DescriptionUnitQty
Concrete Volume TakeoffsCY120
Formwork QuantitiesSF340
Reinforcing SteelLF560
Finishing & CuringEA48
Placing & Pumping Costshrs210
Cold-Weather AllowancesLS1

Illustrative figures only. The real sample PDF will appear here soon.

Footings, Slabs & Structural Concrete

Concrete Estimating

Concrete is typically the largest early-cost item on a project, so accuracy matters. We estimate cast-in-place and precast concrete — footings, foundations, slabs, walls, columns, and suspended structures — including formwork, reinforcement, and finishing.

What's Included

Concrete Volume Takeoffs

Cubic yards calculated for footings, walls, slabs, columns, and elevated decks.

Formwork Quantities

Contact area, forming systems, and stripping labour estimated.

Reinforcing Steel

Rebar by size and weight with laps, chairs, and accessories.

Finishing & Curing

Slab finishes, sealers, hardeners, and curing compounds accounted for.

Placing & Pumping Costs

Pump, crane, and labour requirements priced with each pour.

Cold-Weather Allowances

Heating, blankets, and admixture adjustments for Canadian conditions.

Concrete Estimating

Why Choose Estimating Canada

Built For Contractors Who Need It Right

Volumes verified against structural drawings and sections
Cold-weather concreting considered where applicable
Delivered as an itemized Excel and PDF report ready for your bid
Small jobs in about 4–6 hours, large projects in 6–48 hours, with free revisions on addenda
Confidential handling of your plans and bid documents
Get a Free Quote

Concrete estimating services for Canadian contractors

Concrete is priced in more places than most people think: the concrete itself, the formwork, the rebar, the finishing, the pumping and, for half the year in Canada, the cost of keeping it from freezing.

We prepare concrete takeoffs and estimates for footings, slabs, walls, columns, stairs and structure, with concrete, formwork and reinforcing shown as separate lines.

| What we count and price

Cast-in-place concrete by element and strength, in cubic yards or cubic metres
Formwork area by element: footings, walls, columns, suspended slabs
Reinforcing steel by bar size, including laps and accessories
Slab-on-grade: vapour barrier, insulation, mesh, finishing and curing
Pumping, placing and finishing labour
Anchor bolts, embeds, waterproofing and dampproofing where specified

| Canadian concrete detail

Concrete follows CSA A23.1 and A23.3, with strength in MPa and exposure classes (such as C-1 and F-1) from the drawings
Rebar is metric bar sizes (10M, 15M, 20M and larger) even on drawings that use feet and inches
Cold-weather concreting: heated enclosures, blankets, hot water and extra supervision
Frost depth at footings differs by region

| Yards or metres

We report in cubic yards, cubic metres or both, to match what your supplier quotes in.

| Waste and winter costs

Concrete waste, from spillage, over-excavation and form leakage, is shown as its own line, usually up to about 10%. Winter protection also gets its own line, so you can see what November through March adds instead of having it buried in the unit price.

| Timing

Small concrete takeoffs are normally ready in about 4 to 6 hours and larger projects in 6 to 48 hours, depending on size and urgency.

Frequently asked questions

Do you quote in yards or metres?

Either, or both. Tell us what your supplier uses.

Do you do rebar detailing?

We take off reinforcing quantities for estimating. Shop detailing for fabrication is a separate service.

Do you include pumping?

Yes, as a separate line, when the project calls for it.

Can you price winter concrete?

Yes. Winter protection is priced as its own scope.

Get a Quote

Get a Quote for Concrete Estimating

We’re online now — replies in minutes

Tell us what you need and we’ll get back to you within minutes.

No file chosen

PDF, images, Word, Excel, DWG/DXF or ZIP — max 100 MB